Pages on the site

Thursday, 3 February 2022

FH Dry Build - Front Stand

Amidst various domestic and railway activities, the FH Dry Build marches forever onward - and I am beginning to run out of jobs. Did I really say that out loud?

I took a series of pictures for the dating certificate and this one reveals graphically that the front stand is wrong - it's either not Ariel, or perhaps is for a bike with a smaller wheel, though I can't see that somehow. The FH has a 19" front rim and none of the bikes I am aware of use a smaller rim than that, apart from the Leader & Arrow neither of which use a front stand.

Anyhow, it has the right fitting at the rear and is the right shape, so I am going to use it.


Removing the stand in the safety of the workshop reveals it is about 3/4" too short:


What I have done is cut both legs as square as I can and trimmed them up on the linisher. Then, I've taken a piece of 5/8" x 16 swg tube and cut two 3/4" sections on the lathe; I've also cut two pieces out of a scrap footrest bar (which was bent) to support the spacers and keep everything aligned:


I've set it all up on the bench, and cleaned the areas to be welded on the wire wheel. There's a bit of 5/16" bar through both ends to keep them aligned while I tack it together:


Two autogenous butt welds on each side, 40A:


And there we go, problem solved.

All we need now are a couple of Thackeray washers and I can make the pivot bolt spacers on the lathe. 

Here they are now, 5/16" ID, 3/8" OD and 7/16" long 303 stainless:

Bolts are 5/16" CEI x 1". This is how they fit:

The stand pivots around the spacer and the Thackeray washer prevents it all rattling. You can drop the stand by loosening the single nut at the back of the mudguard.


No comments:

Post a Comment