FH - toolbox, charging and other progress

 The toolbox is back on:

In other news, the primary case now has oil and the FERC is no longer dripping oil all over the bench. The oil tank now has a felt wick for the chain case feed:

It's made from a strip of felt, 10 mm x 10 mm x 25 mm:

I made this short video to record the fact that the battery is now charging after we re-polarized the dynamo and updated the RB108:

Doesn't the engine sound great! I got it started a couple of times using Easy-Start, but it only ran for a second or two. Playing around with the fuel supply, I eventually tickled it for a long time - until I had a flood under the carburettor. It started and ran perfectly, but needs choke - perhaps I am starting to learn the technique?

To report on a couple more things: the clutch cover screws are a bit short of thread - there is a 1/16" unthreaded section under the head - cutting the thread on that bit will allow them to go fully home. I've put shake proof washers on them for the moment.

I've failed to improve the front brake - any more turns on the adjuster just lock it solid. It will have to come apart.

The oil banjos on the rocker box are in good shape - they have a lot of contact area though, so they have to be very tight to seal. I've smeared a bit of Wellseal on them which seems to have done the trick.

Number plate next, then the instrument panel and lastly the fuel tank.

Sunday, 22 December 2024

FH - voltage regulator

 One of the jobs on the list is to make the dynamo work. During the wiring up process I decided to make the bike negative earth to allow for fitting of things like USB chargers and other modern accessories, on the basis that this bike will become the universal machine. To that end, the dynamo will need to be repolarized, more of which later.

Another thing that I need to do is to fit an electronic regulator to match the VRLA batteries I have fitted. The late Ariel four-strokes were fitted with a Lucas RB108 regulator, and we will replace the inside components of one of these with a V-Reg 2b from AO Services here in Norfolk.


First we remove the aluminium cover, bending back the tabs and pulling out the inner parts of the regulator:


There are two steps to removing these bits. First you can undo two nuts under the Bakelite board to release the solenoids. You will also need to remove a single screw that retains the frame of the regulator.


The next step is to cut the wires and links leading to the four terminals. It's easiest to cut these to remove the obstruction of the solenoids before you take a large soldering iron to the terminals and release the little bits of wire that are left. You can then open the terminals ready to receive the wires from the new regulator when it's time to re-solder.


The V-Reg 2b has a couple of options for retaining the unit to the base; there are two bolts supplied which fit neatly into the old solenoid holes. The next job is to route the wires to the appropriate terminals and solder them up. I like to use an old-fashioned wire lacing technique to make a small wiring harness inside the unit. The lacing is wax coated linen thread tied with a clove hitch and reef knot to hold the wires together.


All that remains is to put the cover back on and close up the aluminium tabs as best you can. Alternatively you could use some hot melt adhesive to hold the cover in place.



Thursday, 5 December 2024

FH - inching closer...

 The day seems to have disappeared again without too much workshop time but at least I've got a little bit done. 

The choke cable is now terminated to the right length, with a new nipple at the carburettor end. I didn't have the flat nipple that goes into the lever unfortunately and I didn't fancy making one on the lathe but I did have a little tiny one that goes in the choke slide.

There's not much to see here but at least we have a throttle slide and a choke slide that move independently of each other and don't have any slack in the cables.


The next little job is to make a couple of 5/16 CEI bolts to retain the finned exhaust clamps. Here I'm reducing some 0.445" stainless hex bar to the appropriate diameter for the bolts I need.


They're going to have a chamfer feature where they mate with the clamp - here is the chamfer on the clamp itself. When I have cut the thread on the bolt I will work out what the height of the bolt head above the clamp face needs to be:

That's all for a bit. I've got a 10-hour turn on the railway tomorrow which won't finish until after 11:00 at night, and then my grandchildren are coming for the weekend. Hopefully we will get the speedometer in the post either tomorrow or Saturday, so they'll be plenty to play with next week. I'll order the V-Reg2b voltage regulator as well, so we can convert the RB108.

Sunday, 1 December 2024

FH - where are we again?

Doesn't she look great?




  A few weeks after the last catching up post I'll write another one. It might be a bit boring for some but it's very useful to have a list of where you are and what you've got left to do, especially as there are some tiny things that get forgotten very easily - for example I've put the new gearbox inspection plug on the rocker box, and now I can't find the rocker box inspection plug...

I’ll summarise where I am in order to work out what to do next:

  1. Engine: the engine is basically finished. Ignition timing is done, the oil lines are connected up and I have done the circulation on the power drill and proved that the lubrication system works properly. The next step is to finish the head steadies for which unfortunately I have to lift the rocker box slightly in order to get the nuts on. Thinking about this again, I just fitted the drive side exhaust and I'm well on the way to fitting the timing side exhaust and both of these interrupt access to the head steadies...
  2. Oil System: the lubrication system is working as I said but I've realised the oil tank will have to come out because one of the seat bolts is missing; and actually the oil tank isn't bolted in properly. There's also a small leak coming from the return filter.
  3. Fuel system: carburettor needs gasket sealant and the air cable shortening.
  4. Ignition system: HT leads need to be terminated into their caps, and the plugs need to be screwed in.
  5. Gearbox: so today I have put the kickstart case back on as you will have seen in a previous post, but I seem to have lost the inspection cap. I need to fit the gear position indicator, fill the gearbox with oil and solder a nipple onto the clutch cable but then we'll be done.
  6. Clutch: I'm fairly confident that the clutch is completely finished, apart from fitting the dome.
  7. Chains: primary is in, tensioned but not oiled; secondary has a dummy fitted.
  8. Exhausts: the timing side is fitted but the drive side is still loose. Both of the finned clamps need to have screws made up on the lathe.
  9. Electrics: the electrical system is more or less working with a couple of exceptions. The instrument panel is waiting for the speedo to come back from Chronometrics, the battery is still wired negative earth while the dynamo has not been flashed to suit. The voltage regulator enclosure still contains the original RB108 components which will need a modern conversion to suit the VRLA batteries.
  10. Control Cables: the throttle and front brake cables are finished; the air cable needs the nipple moving about half an inch and the clutch cable needs both nipples replacing and the inner cut to suit.
  11. Wheels & tyres: these are parked until the machine is running. I might have a look at the front brake shortly, just to clear it out before I am tempted to ride the bike around the yard!
That about sums it up. Cables next?