Showing posts with label FERC. Show all posts
Showing posts with label FERC. Show all posts

Thursday, 12 March 2026

Charlie's shed - adjusting primary & rear chains

 The Huntmaster clicked over 400 miles on a run recently and is bedding down nicely. Checking it over in the workshop revealed a front chain that was rather loose, and of course one of the issues that you learn when dealing with these old bikes is that if the front chain is loose the rear chain will probably be tight as sometimes the gearbox will move. 

It's time to have a look at both chains, and for this we will use the on board toolkit:


First stop is under the oil tank where we find the gearbox top bolt and the chain adjuster. Loosen the nut on the right a little bit and then use the chain adjuster to draw the gearbox backwards or push it forwards.

Next you need to gain access to the primary case so that you can inspect the tension on the primary chain and later top up the oil. If this is tight use a big flat spanner to undo the inspection cover:


Now you can see the chain. This should have about 3/8" up and down movement and this should be slack movement - the chain should not be stretched tight and you should not be putting much effort into moving it. If the chain is too tight you will be putting undue pressure on the engine main and gearbox bearings, not to mention the chain itself and the clutch basket bearing. Typically the chain will get looser as it wears and you will use the gearbox adjuster to draw the gearbox backwards by a little bit to tighten the chain. When you are done, leave the gearbox adjuster where it is and tighten up the gearbox top bolt.


Turn the engine over on the kickstart and test the chain in a couple of places to ensure it's not over tight anywhere.

Once the front chain is done, we can look at the rear chain. The Huntmaster has a fully enclosed rear chain case and the inspection point is behind a grommet which itself is behind the left hand side silencer. It's easiest to remove the silencer to gain access to the chain:


This is much easier on bikes with only a simple chainguard, but on this one we can enjoy the fact that the rear chain oiler is doing it's thing in keeping the chain clean and lubricated.

Once you can access the chain, slacken off both the wheel nuts and the lock nuts on the chain adjusters shown by the spanner in this next picture. When you tighten the rear chain you must make sure that both adjusters are turned by the same amount - count the flats - to make sure that the rear wheel alignment is maintained. Be really careful with this because setting up the rear wheel alignment is a bit of a pain. Do the lock nuts up when you're done and tighten up the wheel nuts again.

When checking the rear chain it's best to turn the wheel and sit on the bike, because a swinging arm bike will always tighten the chain when the swinging arm deflects upwards. Ariel recommend 5/8" chain movement with the swinging arm deflected to normal riding position and 1 1/4" to 1 1/2" with the bike on the stand. That's quite a difference and comes from the frame geometry - the swinging arm pivot is a long way from the mainshaft centre.

Monday, 16 June 2025

FH - back in action

 With the Square Four on the bench, the Huntmaster fixed and a trip for a job in Cromer in the offing it's time for a little bike ride. 

In preparation, I topped up the oil a couple of days ago as I had had the return system apart and expected the filter to be empty. I turned the engine over on the kickstarter with the plugs out in order to prove circulation before I used it again. 

After I'd finished my decorating job, I came back to the bike to find a little puddle under the rear chain case. I guessed there might be too much oil in the oil tank and so it proved: 

I filled the big syringe twice getting this back to an acceptable level. It's been off the road for a couple of weeks and obviously wet sumps! 

At the same time I adjusted the front brake and the head race bearings.


Sunday, 8 September 2024

FH - preparing the primary drive

There are a lot of work faces appearing on the bike now the cylinder head is ready to go on; the timing side can be assembled once the automatic timing device is finished and the primary side can have the clutch fitted and the primary chain built up. For no particular reason I've elected to start on the primary side mainly because I don't have the bench space at the moment to do the ATC. Here I've fitted the 19 tooth standard gearbox sprocket with a spare secondary chain and torqued up the big nut.

 
The spare length of chain I had knocking about was too short so I've taken this unusual approach of wiring it through the holes in the sprocket just to allow me to use the back brake to tighten up the gearbox sprocket nut.

With that done we can start looking at fitting the inner primary case half. What's different about this bike is that it's fitted with the fully enclosed rear chain case (FERC) something I have not yet experienced on an Ariel. There are a couple of unusual mounting points, one of which is this nut which is attached to the front half of the FERC.


It's a 1/4 in CEI bolt which needs a special tab washer to retain it to the inner primary chain case casting and to prevent it coming undone, dropping into your primary drive. The special lock washer is available from Draganfly but unfortunately I forgot to order one. I've made this one out of a piece of 0.9 mm sheet steel.

Here it is with the bolt tight and the tab washer folded up.


For the record I have fitted that 1/4" BSW screw with low strength threadlock from Loctite. The castellated nut retaining the engine shaft shock absorber will need a split pin to prevent it falling off.


That's it for now; the next step will be to think about the clutch. I expect to find some parts that are in need of replacement so I'll have a look at the clutch soon to get those on order.

For now, let's just record that I fitted a new length of primary chain and an old spring link just for now. I'll have to order a new one. 


The other thing to bear in mind is that the chainwheel is rubbing on the oil catcher so I'll have to sort that out before I put primary case outer cover on.

Friday, 20 October 2023

FH - Chain oiler

 A couple of days ago we fitted the FERC with the front chain oiler pipe, which dribbles oil from the top of the oil tank. There's a felt restrictor up there which catches some of the oil from the return, and below the restrictor it's piped out of the bottom of the tank.

We left the pipe pointing vaguely at the tank:


It needs a bit more bending, fitting and fiddling:


It also needs a bit of trimming, and now it fits!

We just need some 4 mm fuel line to connect it to the bottom of the oil tank.

Thursday, 19 October 2023

FH - getting the FERC fitted

 Next jobs are to secure the mudguards prior to temporarily fitting the wheels. First though, we have a few more bits from Draganfly - the fork top nut washers and the steering damper knob spring:

Then we need to fit the FERC, or Fully Enclosed Rear Chaincase in Ariel speak. It's a big floppy tin thing and is a bit of a struggle, but it goes on. You have to fit the rear sprocket and it's stub axle first:


That nut will get plated in the coming months, but I am not so sure if those washers are the correct outside diameter.

I'm hovering around fitting the gearbox but I need to clean it first. Before that can go in we can fit the oil filter on it's bracket - it's nut is a candidate for plating too:

The FERC looks tidy when it goes in; the smaller bolt in the outside of the lower half is a pig though, as it is hidden by the pillion footrest support.

You can most definitely get the oil filter out with the FERC in place!

The front part of the FERC must go in before the gearbox, and that needs the chain oil line:

The front half is retained by two screws to the frame above the swinging arm:

The oil line will need adjusting for length and some bends changing:


First I have to figure out which line to connect it to!

Sunday, 9 January 2022

FH Dry Build - Rear Brake Pedal Pivot

Assembling the FERC has revealed another little challenge - the brake pedal pivot will not fit without hitting the lower section of the FERC. This one, which came with the kit is identical to the one fitted to my 1951 Square Four and is 96.5 mm long:


AOMCC member Dean Waters provided this picture along with the information that his pivot was 92.5 mm long. Ariel did not change the part number of this component (which is 5412-51), but since it will function on non-FERC machines just as well in the shorter form, there was no need to change the part number.

You can see that Dean's is still very close to the FERC but does not touch it:


It's a simple matter to turn a few millimetres off in the lathe.



Thursday, 14 October 2021

FH dry build - one step forward...

 I spent a lot of time reshaping the FERC so that it would fit around the swinging arm, and I'm pleased with it now.

Trouble is, I didn't realise that to get the front section on, the rear has to be off:


And, as if to rub it in, you can't get the rear off with the shock absorber in position... 


So, its all got to come apart again but that's what dry builds are for. It's helped by the removal of the rear end of the mudguard, which looks good. I'm pleased with the work I put in to that. 



When it's back together I can trial fit the inner primary chain case. 


The front section of the FERC has a captive nut to attach to the inner primary case. 


A small job coming up - remove the broken case screw:


While I was poking around the rear end (and wearing working clothes) I used a crayon to make a mark on the swinging arm, with the mudguard, centre stand and oil filter in place. This was where the swinging arm grease nipple would go. 



Monday, 26 July 2021

FH Fully Enclosed Rear Chaincase

Ariel's fully enclosed chain case was an optional extra on Huntmasters, and I didn't have one - but this appeared on eBay. It's pretty rusty but it is solid, if a little bent. I spent a lot of time getting it to fit together like this:

The main problem was that the bottom half had been squashed at some point - it's on the right in the picture below


This illustrates the problem. The bottom half mates correctly with the top half to the left of the axle, but it is way out on the right - the area below the axle is much less dished than it should be. I put that dish back with some light beating and formers.


The front area is fine:


It moves over the front section nicely:





Friday, 5 April 2019

Welding Nuts

As you will know, the swinging arm Ariels make use of Spire fasteners and matching screws in various places, which look a lot like blunt self tappers. These appear in the rear mudguard and the seat base. Additionally, the bikes use captive nuts in sheet metal cages (I made one here) in the headlight and in the chainguard.

Of course, the captive nut in the chainguard was missing. I thought about making one, and having fiddled around for a while making a 5/16" one for the headlamp, I wasn't about to make a smaller (1/4") one for the chainguard that no-one would ever see, so I decided to weld a nut in.

Now the tab on the chainguard is not so large, and I wanted something larger than a conventional nut to weld to, and secondly I wanted to make sure the thread was in the centre of the square hole in the chainguard, so I came up with a special nut, designed to be welded in:


It's turned up from a piece of 3/4" round bar on the lathe:


It's got a 0.35" diameter journal to fit into the hole, and a lead in chamfer to a 1/4" BSCy thread:


The back is also chamfered, to allow me to make a fillet weld easily:


I'll make some 5/16" ones for the mudguard and seat.

Saturday, 2 February 2019

Dry Build - Repairing the Chain Guard

Moving on, we can start on the repair of the front section of the chain guard. This is a bit mangled:



Someone has modified it (with a tin opener) so that it can be removed without taking off the gearbox sprocket.


I don't understand this though:


This is what it is supposed to look like. These pictures are from the excellent members of the AOMCC:




You can see in this last picture, the position of the chain oiler. This is the bit that has been cut out of my mangled example, so we will need to re-create it. Mick D sent me these dimensions:


Mick says this is a 1" hole. I have the grommet from Drags:


Here's a view of the chainguard in situ - that's the chain oil pipe you can see there:


So, on to sorting it all out. Some heat and a hammer has this area flat again:


Heat and hammer again, but this activity only serves to reveal that we will have to cut this lot out:


Five minutes with a pair of aviation snips has cleaned this up. We can now find a bit of sheet to let in:


This bit will need cutting out:


Sanding off the paint allows us to measure the material thickness with the micrometer. It's 0.043", about 18 SWG or about 1 mm thick.


Now, we'll need a pattern to cut a bit of 18 SWG sheet. We can do that with a bit of paper and a pencil - we'll just draw around the other, good side to get the curve around the swinging arm, and we can use the geometry of the main shaft hole to construct the missing curve there.


The chain guard fits around the horizontal frame gusset, which is accommodated in two slots above the 'swinging arm curve'. Luckily, there is enough  metal from these slots to show us where they are.

In the end, we have this little sketch.


Now, we glue that to a sheet of 18 SWG and cut it out with snips and a file. It doesn't want to be too precise, as it needs to be 'fitted' to the job. Then, I put a 2 mm flange on the end of the repair section, around the main shaft hole to match the flange on the original part. That will make the face much more rigid.

In the next picture, the chainguard has a chunk of oak, 1" thick, stuck inside it so we can secure it in the vice. I've trued the lower edge of the cut out area with my hammer, and straightened the cut edge with a file. You'll notice the top edge is still quite bent - I will address that next. I've also messed up the flange at the bottom there, it needs to come in a bit more.


See the little blue and red crescents in the picture? For those that were wondering, they are magnets holding the repair section in place. Here's another magnet, showing the position of the grommet hole:


Ready for welding:



Butt welding with TIG in 18 swg. Set at 25 A with 5 l/min argon:


There are a few points where I need to fill holes I'd blown in it, but generally not too bad. Back side shows good penetration.


Before we go any further, we will do a trial fit and take some more pictures, to understand where the guard is near the frame and other components.


Next, we are going to mark out and cut the hole for the chain oiler grommet. The oiler pipe goes vertically down the triangular gap in the middle of this picture - the grommet position is quite critical:


Using Mick D's dimensions, we can mark out the hole. I thought I might chain drill it and file to shape, so I have used the old-fashioned witness marks around the diameter:


I've made two more repair sections for the rearmost lower edges. We will weld these in later.


I found these step drills on eBay somewhere and they seemed to get a good write up. I decided to use the biggest one to drill the grommet hole:


They make a much better job of drilling holes in sheet metal than a conventional twist drill.

A couple more hours in the workshop sees it fully welded, dressed and protected with a layer of primer.