Monday, 5 September 2016

Missing Speedometer

One of the things that always seems to be missing from my projects is the speedometer. Fortunately I guess all my bikes have chronometric instruments, which do not attract the exorbitant prices of the PA speedos, but nevertheless they are not cheap!

The W/NG was no exception. Fortunately, the drive gearbox is there:



It works, but looks like it is full of crud; the small pinion 5246-38 is missing:


The big one is there though:


The gearboxes are easy to clean out. The two spindles are both retained in place with a pressed plug, a bit like the core plugs you might find in an engine block. The one on the end of the horizontal spindle, that goes into the hub has a grease nipple; the vertical one, that drives the cable is retained by a split pin.

These gearboxes are available in a variety of options:

  1. clockwise in/clockwise out
  2. clockwise in/anticlockwise out
  3. 12:8 ratio
  4. 14:8 ratio

And probably many others. They are quite straightforward to dismantle, though the cast bodies are brittle. Remove the split pin and tap the end of the cable drive spindle with a 1/4" punch - the spindle will push the plug out with it; do the same for the other spindle. clean all the old, hardened grease out and reassemble.


We'll have to buy a cable. It will have a spade type drive:


The small pinion is readily available from our favourite Suffolk spares stockist and is fitted after the gearbox is mounted in the brake plate. I used a split pin, making sure that the legs were trimmed short enough to disappear into the groove around the pinion


Here it is in place. You can see that when it is the proper position, the groove is enclosed in the brake plate and there is little space:



The speedo head is missing of course. I have bought this one from eBay:



It's in very nice, patinated condition and has a light and a trip, unlike the proper S433B military one; but this is more useful to me so would make a sensible choice.

It will need some brackets. 1942 bikes like mine have the separate speedo brackets (5213A-41 and 5213B-41) as shown in the 1943 parts book:


These are the brackets I need:


These are also shown in the 1941 parts book with a different illustration:


So to replicate these brackets, we will make some dummies with 3/4" wide strips of cardboard:


The strip with the two screws mimics the fixing screws on the back of the instrument:


Wondering if I have this rear bracket upside down. I've realised that it doesn't look like the parts book...


The 'upside down' theory seems to be born out by these excellent pictures of 'Burney' a fire-damaged W/NG being resurrected by Vincent van Ginneke of the AOMCC:

You can see that the speedo is at 90 degrees to the front leg of the girder


Top view shows relative position of speedo and headlamp
So let's try again:




Cut a slice of 3 mm thick cold rolled sheet steel, 16.7 mm wide as described by Vincent, not worrying too much about the length at the minute:


Its the bends that matter. Put the piece in the vice and make sure it is perpendicular to the vice jaws:


Two 45 degree bends give us the profile we need:


Clamped in place:


Two holes drilled for clearance on 1/4" bolts:


We will trim up and round the ends when we are finished. No point in doing that until we know it is in something like the right position. Here's my W/NG alongside Vincent's - looking very similar:

 

So here we have the second bracket, bent up and drilled:


And now, completed brackets waiting for paint.


Compare the W/NG at the museum. Looks like bracket is twisted; mine needs the corners removed!



And another view:


This one looks like it is further from the machine centreline:




Thursday, 1 September 2016

Leak Test

As I may have mentioned I have a leak in the fuel tank. I found a product online called 'Seal-All' which purports to be suitable for leaky tanks and is 'gasoline proof'.

I thought I would devise a little qualification test. These are the bits we will use - ignore the regulator! The plan is to make a hole in one of the tins, seal it, and then subject it to long term immersion in fuel to determine if it leaks, or if the sealant changes.


I made a suitable hole in one of the tins using an 8 mm wad punch, which should be very similar to the hole in my tank which was cut with an over long M8 bolt. The idea is that the area of adhesive exposed to the fuel will be comparable to the real hole in the tank:


I laid the adhesive over the hole and let it cure in this position for 24 hours:


After the cure, it is still soft, like a hard cheese. 

So this is the test setup. I have fuel in the top tin, covered with a polythene bag. This is sealed to the tin with a tight elastic band, but the bag is loose to allow movement of the bag to compensate for volume changes in the air above the fuel, preventing any pressure developing in the can which would change the test conditions; the bottom can is there to catch the drips coming through the sealant from the top can:


We'll leave it for a month and see what happens, investigating periodically so that we can get a reasonable idea of how long it lasts - I don't want to look for the first time at 30 days to find a leak which may have happened after 2 days! For the record, the test started on Wednesday 31st August 2016.

Here is the first inspection, 5 days in:


Still no leaks. The sealant is a little harder - maybe a 24 hour cure is not long enough?

Second inspection, two weeks in; still no leaks:


Its possibly a little harder - I'm starting to consider where this will handle any vibration?

Latest picture. 21st September, three weeks in. No change:


More than four weeks, still no change:


6th October - five weeks:


Still no change on the 12th October - that's six weeks:


October 2024 - this repair still hasn't leaked!

Charlie's Shed - Curly copper fuel pipe

We'll need a new copper fuel pipe for the W/NG, like this fine example from Paul Slootheer:


It will need curls to give it some flexibility and it will need to be annealed after bending. We don't want a fracture out on the road, pouring fuel over the dynamo.


We'll use these soldered unions & nuts.


Here is another reference point:

Barn find NH, stored since 1960
Using Paul's guidance & some hints from Nev Hunter I've made a pattern from a thick piece of plumbers solder. You can see the fuel tap here as well, which is a re-sealed original but has a repro hexagon shaped reserve plunger:

Three tight curls
Two looser curls, more suited to 1/4" tube
Using some 1/4" copper pipe, we'll bend up the real thing. It's important to think this through, bend by bend and perhaps to buy enough pipe to have a second crack at it if it all goes horribly wrong!

Take it slowly; you have to realise that in bending the pipe you are aiming to stretch the copper on the outside of the bend. You can avoid flattening the pipe by filling the pipe with sand or solder, but if you are gentle and controlled this is not really necessary and was certainly not done by the factory. Use a hardwood former - I used a 1 3/4" oak dowel, that I used as part of a kitchen worktop project.

The first bend
The first bend is an easy right angle bend around the former. Make sure there is enough length to bend up the tail into the bottom of the float bowl later on.

First bend against the pattern
Start to form the curls by clamping the downward tail against the former in the vice This is probably the most difficult part of the whole operation.

Holding the first bend in the vice and starting the first curl around the former
The design of the vice usefully allows you to trap the downward tail in several positions as you form the first curl around the former.
Moving the downward tail around the vice and continuing bending the first curl

Moving the downward tail again, and complete bending the first curl

Moving the downward tail around the vice again and starting the first second around the former

The curls, finished
Once the curls are finished, have a good look at them against the pattern. This is where the pattern is most useful, as until you cut the copper pipe to length you cannot really fit it against the bike.

Add the upward bend toward the tap

You can now put in the last bend, which is the U bend beneath the float chamber. This is simply bent around the former, making sure that start of the bend is in the approriate position to allow the finish to land in the union beneath the float bowl.

Roughly trimmed to length
I'm currently waiting for the tank mounting rubbers to turn up. Until they do, I'm not sure of the final resting place of those ends...

So, with the tank bolted in the correct position we can try the new fuel line in place and trim it to fit. Attach the nipples with their nuts (but without the fuel line) to the petrol tap and carburetter and offer the fuel line up - I put the end of the line in the carburetter float bowl union first since this is least accessible. The most important thing here was to get the fuel line to avoid the dynamo and the advance retard cable:


This meant that I had to cut the carburetter end of the line as close as possible to the bottom bend, to get it as high as possible. This done, I could set the line in the carburetter end and see where the other end was going to fall. With a little trial and error, remembering not to cut too much off at once, I got pretty close:


I need about another 1/4" off the tap end. Cut with a tube cutter or a hacksaw, deburr properly and blow out the line:


Since you are cutting tiny lengths off at this stage, its easier to use a hacksaw. A tube cutter crushes the tube a little which is a problem when cutting short lengths. Another 1/4" should do it:


With the nuts in place, it is stiff enough to do some final tweaks on the bends, in my case to avoid the dynamo:


Ready for annealing & soldering up. Not looking too shabby:


Next step, before soldering the nipples on, is to anneal the pipe - in other words to remove the work hardening stresses that have built up during bending - I am sure you noticed it got stiffer after bending? You don't want to leave the pipe in that state, because it is going to bend a little in service, through vibration, and this will make it harder still eventually leading to a fatigue failure.

For copper, the annealing process involves heating the material to cherry red and quenching in water. No problem for the mighty Rothenburger torch, even with propane in the tank. You will want to clean the scale off with wire wool after annealing.

Be careful with the pipe from now on - it is very soft and will bend very easily.


Tin the ends with solder after fluxing; put the nuts on the right way round, and sweat the nipples on. I use a small butane torch for this - do not overheat the joint, or the solder will not take.


Finished.